Our All-in-One Environmental Chamber is specifically designed to work seamlessly with NEWARE battery testers , providing a fully integrated solution for battery testing applications. The chamber combines temperature control, customized chamber fixtures, and test system integration into a single, compact platform.
Equipped with our self-developed, customized chamber fixtures, the system ensures stable battery placement, reliable electrical connections, and efficient test setup. Through direct linkage with our BTS system, temperature control and charge/discharge testing can be synchronized, enabling automated test execution, real-time monitoring, and centralized data management.
This integrated design significantly simplifies system configuration, improves testing efficiency, and reduces laboratory footprint, making it an ideal solution for R&D laboratories, quality control, and pilot production environments.


WHW-25L+15C-5V100mA-16CH
Temperature:15~60℃
Temperature fluctuation: ≤±0.5℃ (no load, temperature stable)
Temperature deviation: ±2.0℃ (no load, temperature stable)
Heating time: 25℃→60℃ ≤50 min (no load, average nonlinearity)
Cooling time: 25℃→15℃ ≤60 min (no load, average nonlinearity)

WHW-200L-0C-220V-5V100mA-160CH
Themperature:0~60℃
Temperature fluctuation: ≤±0.5℃ (no load, temperature stable)
Temperature deviation: ±2.0℃ (no load, temperature stable)
Heating time: 25℃→60℃ ≤30 min (no load, average nonlinearity)
Cooling time: 25℃→0℃ ≤50 min (no load, average nonlinearity)

WGDW-200L-40C-380V-6U
Themperature:-40℃~150℃
Temperature fluctuation: ≤±0.5℃ (no load, temperature stable)
Temperature deviation: ±2.0℃ (no load, temperature stable)
Heating time: +20℃→+150℃ ≤60 min (no load, average nonlinearity)
Cooling time: +20℃→-40℃ ≤60 min (no load, average nonlinearity)
